ECO TREAT
STP and ETP, 5 KLD to 500 KLD
Water conservation is not a separate initiative for us. It is a design constraint: the recovery a plant achieves, and what happens to what it rejects, are decided on the drawing, not afterwards.

Water conservation is not a separate initiative for us. It is a design constraint: the recovery a plant achieves, and what happens to what it rejects, are decided on the drawing, not afterwards.
Reduce unnecessary water consumption and RO reject generation.
Increase useful water recovery through efficient treatment design.
Treat wastewater so it can be reused for appropriate non-potable applications.
Reduce dependence on freshwater wherever technically and economically practical.
Treated wastewater is reused for appropriate non-potable applications — flushing, gardening, cooling make-up — reducing dependence on freshwater wherever that is technically and economically practical.
Our Approach to Water ReuseAn STP or ETP designed only to meet a discharge limit throws away water that a slightly different design would have given back. We start from the reuse target and work backwards.

Packaged or civil-construction STPs for apartment complexes, hotels, commercial buildings and institutions — with filtration and disinfection on the outlet so the treated water is fit for the non-potable uses the site actually has.
Removing the solids that would damage everything downstream.
The stage that actually reduces the organic load.
Clarification, then filtration to the quality the reuse target needs.
Final treatment before the water is put back to work.
Effluent is process-specific, so an ETP is designed from the effluent characteristics and the target — discharge compliance, water recovery, or both. Physical, chemical and biological stages are combined as the stream requires.
The process decides the effluent, so the effluent decides the plant.
Neutralisation, coagulation and separation, selected against the stream.
Where the effluent carries a treatable organic load.
Added where the site wants water back, not only compliance.
Every STP and ETP is engineered to order — capacity, process and construction all follow from the stream and the site.
Request a Wastewater DesignSTP and ETP, 5 KLD to 500 KLD
Bright Water Tech designs high-recovery RO plants capable of achieving up to 75% recovery, where feed-water conditions permit. The gain comes from the staging, the pre-treatment and the dosing regime working together — not from running a standard plant harder.
*Recovery depends on source-water characteristics and system design.
Whether you are looking for a home purifier or planning an industrial plant room, our engineering team is in Salem.
Or call us directly — +91 99438 46677